Description

Peñoles acquired the old Sabinas mine in 1994, thereby consolidating its participation in a new mining district. In 2006, the installation of a lead-copper separation circuit was completed, yielding higher quality concentrates. Ever since, significant investments in exploration have confirmed additional reserves, justifying subsequent increases in milling capacity from 150,000 tons per year to 1.3 million tons per year as of today.

In May 2019, the Sabinas complex was the first Peñoles operation to earn ISO 45001 certification, an international standard for Occupational Safety and Health Management.

Key Information

  • Location: Sombrerete, Zacatecas
  • Ownership: 100% Peñoles
  • In operation (under control of Peñoles): 1995-to date
  • Facilities: Underground mine and two beneficiation plants
  • Production: Polymetallic (silver, zinc, lead, copper) in three concentrates: lead, zinc and copper
  • Type of deposit: Underground massive bodies and veins
  • Installed capacity: 1.3 million tons/year of milled ore
  • Used capacity: 87%*
  • Reserves: 22.1 million tons of ore*
  • Mine Life: 17 years*
  • Employees: 760*

* Figures to December 2022

Production in 2022

1,155 kton

Ore milled

-10.1% with respect to the previous year

2,688 koz

Silver

-14.2% with respect to the previous year

6,611 ton

Lead

+13.9% with respect to the previous year

15,219 ton

Zinc

+5.3% with respect to the previous year

2,771 ton

Copper

-24.6% with respect to the previous year
Data Center

Our mines location

Sabinas